What Our Clients say
Very good service, level of work done is to a good standard.
I have worked with EnvFab for over 10 years across a wide range of projects. As Contract director for facades, it is imperative to build relationships with key partners who we use time and time again on our projects. Working with EnvFab is always a pleasure, their professional approach, up-front thinking, design capabilities, quality of manufacture and install is second to none and we will continue to work closely with this fantastic business in the future.
Delivery is key and EnvFab have never let me down.Envfab were employed by Gallagher Ltd at EXCEL Phase 3 Project East London to fabricate bespoke support steels and to provide an installation service, of welding and enabling works. The works were carried out to a high standard over a 7-month period, Envfab were very professional from start to finish offering a high level of expertise. Their commercial business, performance and professionalism was of a high standard. As was their site safety, qualification and punctuality of their contract’s manager and site team.
I would certainly recommend Envfab throughout the construction industry and look forward to working with them in the future.I would not hesitate to use EnvFab on future projects.
Excellent service from EnvFab – Their quick response enabled us to resolve operational & safety improvements to the segment factory at Chatham Dock.
The successful completion of the Abberton Pipeline Project owes a lot to EnvFab’s performance and the quality and efficiency of their work.
I would have no hesitation in employing them again or recommending them for similar work.EnvFab continue to demonstrate their ability to work hand in hand with the main contractor and other trades to solve difficult problems, deliver cost effective solutions and safeguard the programme without compromising quality.
The installation of the feature staircase at UOE was exceptional. This was a challenging installation but any issues were dealt with in a very professional way.
Communication, Health and Safety and the overall performance of the site team were first class.