We were sub-contracted to the Galliford Try/Imtech JV for Anglian water. This contract involved fabrication and supply of galvanized steelwork for a variety of different packages within Basildon WWTW. One of the key the challenges was to prioritize the client’s needs, fine tuning requirements and maximizing on deliveries to site. This was achieved by the pre-assembling of stair cases and walkways. To streamline the installation process and reduce Health and Safety risks.