Envfab was contracted by Farrans Construction to weld all the 42km replacement 1200mm diameter steel pipes Conduit from Spelga Dam to Belfast in Northern Ireland. The Mourne Conduit was originally constructed in 1901 and extends 56 kilometres. The existing conduit gravitates with a maximum flow of 147 ML/day through tunnels, siphon pipes and arched concrete conduits.